MERRY XMAS and A HAPPY NEW YEAR
PROTECNO srl IS CLOSED FROM 12.24.2016 TO 01.08.2016
PROTECNO srl IS CLOSED FROM 12.24.2016 TO 01.08.2016
WE ARE CLOSED FROM 12.24.2015 TO 01.06.2016
The photovoltaic system installed in one of the sheds of Protecno’s headquarter has produced more than 444,000 kW/h from the date of its installation, in April 2011, to date, in April 2015. A thermoelectric power plant to produce the same amount of energy would have consumed more than 110,000 liters of diesel releasing approximately 260,000
WE ARE CLOSED FROM 12.24.2014 TO 01.06.2014
ECONOMY & SUSTAINABILITY: 2nd MEETING FOR THE 6th EDITION OF THE EUROPEAN WEEK OF SMALL AND MEDIUM-SIZED ENTERPRISE EUROPEAN SME WEEK 2014 – TWO ITALIAN-CROATIAN EVENTS PROMOTED BY THE MUNICIPALITIES OF MONDOLFO, RIJEKA AND TROGIR IN PARTNERSHIP WITH PROTECNO SRL. ON NOVEMBER 28th IN RIJEKA (FIUME), THE SECOND CROSS-BORDER EVENT. The event takes place in Rijeka on
ECONOMY & SUSTAINABILITY: TWO WORKSHOPS FOR TWO CITIES FOR THE 6th EDITION OF THE EUROPEAN WEEK OF SMALL AND MEDIUM-SIZED ENTERPRISE In reference to the good business practice in green economy, our Company has been selected and introduced in the program of two workshops dedicated to transnational Economics and Sustainability. These workshops are promoted within
PROTECNO srl will exhibit at ECOMONDO 2014 HALL D3 – STAND 054 18th International trade fair of Material and Energy, Recovery and Sustainable Development ECOMONDO – THE GREEN ECONOMY´S MEDITERRANEAN PLATFORM From November 5th to 8th 2014 the great expo event dedicated to major European and international strategies on eco-innovation and transforming waste into a resource will be
Protecno is manufacturing a plant for the production of ultra-pure water (conductivity ≤ 0.2 µS) for an important Italian chemical industry, consisting of 4 lines, for a total production of 200 m³/h. The system is configured according to the following sequence of treatment: mechanical filtration, ultra-filtration, reverse osmosis first pass, reverse osmosis second pass and
Protecno is building the desalination plants that will provide the Island of Pantelleria with drinking water; the capacity will be 6,000 m³/day. The final delivery of the plants is scheduled for September 2014.
Protecno is manufacturing a first batch of desalination plants intended to supply drinking water for the Island of Vulcano; the capacity will be 2,160 m³/day. Final delivery of the plants is scheduled for September 2014.